householdmou

Joined: 28th December 2020

Profile

Profile Information
In the process of Pipe Fitting Mould of plastic caps, due to mold, materials and equipment, etc., the parts may be burred, lack of material, etc., which will increase the failure rate of parts.There is a shortage of material. The lack of material generally refers to the situation in which the shape of the part does not conform to the design due to the filling of the cavity of the mold during the processing of the plastic.The cause of equipment shortage is mainly the nozzle part, which is generally blocked by the nozzle; the quick solution is to clean the nozzle. In addition, the leakage of the nozzle can also lead to lack of material, but such failures generally require the replacement of a new nozzle.Generally caused by the internal exhaust of the mold is not smooth.
Membership Level Standard
Real Name householdmou
Occupation Blowing mould
Interests Plastic injection mould
Website Visit Website
Join Date 28th December 2020
Last Login 28th December 2020 - 07:14

Profile Comments

No profile comments to show, be the first!

You must be a member for at least 30 days before you can post portfolio comments.

Proudly supporting Pentax User

Samsung Logo Asahi Pentax Logo